Minimises CAPEX spend
Extremely cost-effective OPEX costs
Significantly reduced SURF/SPS costs
Flexible contracting period(s)
Improved safety on DP options. Disconnectable Turret Buoy System DTS enables rapid disconnection from the energy source and protects the subsea infrastructure from potential damage.
Significantly improved flow assurance: the Early Production Vessel can sit directly above wells.
Easily modifiable during the life of the field. Disconnect the DTS from subsea facilities and, when docked, perform modification under controlled conditions with full onshore support. Maintenance can be carried out without costly offshore personnel, supply vessels or IRM programmes.